Projects, Engineering & Construction
  • Español
  • Accountancy & Administration Software
  • Email
Aliva Stump, C.A.
  • HOME
  • COMPANY
    • History
    • Corporate data
    • Clients
    • Partnerships & Alliances
  • PROJECTS
  • CONTACT
    • Business
    • HR

Projects

Aliva Stump, C.A.Specials
03/01/2017 By AlivaStump 0 Comments

Yacambu – Quibor Development

Generalities

Tunnel exploration.

03/01/2017 By AlivaStump 0 Comments

Soil stabilization and projected concrete, Autopista Coche-Tejerías, Autopista Caracas-Guarenas, Avenida Boyaca, among others.

Generalities

Soil stabilization and sprayed concrete. Duplex System – Stump.

03/01/2017 By AlivaStump 0 Comments

Masparro Reservoir Tower

Generalities

Tower taken from the Masparro reservoir, in reinforced concrete.

03/01/2017 By AlivaStump 0 Comments

Ministry of Education Headquarters

Generalities

Earth Movement, Screens and Walls. Extension, cable-stayed walls on the north and west boundaries.

03/01/2017 By AlivaStump 0 Comments

Guarenas River Channeling

Generalities

Channeling with concrete structures of the Guarenas river.

03/01/2017 By AlivaStump 0 Comments

Reinforcement and Expansion of the Cementos HOLCIM Plant Pier

Generalities

Reinforcement of the existing platform and Dukes of Alba and expansion of the south and north platform, installation of 6 mooring buoys.

03/01/2017 By AlivaStump 0 Comments

Structural Reinforcement of IBM Venezuela Building

Generalities

Seismic structural reinforcement to an existing building.

03/01/2017 By AlivaStump 0 Comments

External Emergency Stairs, Lecuna Level Walkway, structural reinforcement of the East Tower of Central Park

Generlities

Demolition, reconstruction of structures of 22,000m2 of slabs, approx. 9,000 Tn. Recovery of concrete structures and treatment of pathologies. Steel structure, precast concrete, civil works, for the construction of 2 emergency stair towers of 216m high each. Manufacture and assembly of obelisk and metal structure walkway.

03/01/2017 By AlivaStump 0 Comments

Rehabilitation of La Rinconada Racetrack

03/01/2017 By AlivaStump 0 Comments

Integration axis Vial Santa Lucía Kempis – Bridge over the Guaire River

Generalities

Construction of the bridge over the Guaire River Eastern Section Santa Lucía Kempis Road Integration Axis 160.00 ML.

  • Page 1
  • Page 2

+58 (212) 761 79 22

aliva.stump@alivastump.com

Torre América

Bello Monte, Caracas.

Aliva Stump, C.A. © 2020 – RIF: J-00001030-7
Design & Development Macroplus, C.A. – RIF: J-31633121-0