Yacambu – Quibor Development
Generalities
Tunnel exploration.
Tunnel exploration.
Soil stabilization and sprayed concrete. Duplex System – Stump.
Tower taken from the Masparro reservoir, in reinforced concrete.
Earth Movement, Screens and Walls. Extension, cable-stayed walls on the north and west boundaries.
Channeling with concrete structures of the Guarenas river.
Reinforcement of the existing platform and Dukes of Alba and expansion of the south and north platform, installation of 6 mooring buoys.
Seismic structural reinforcement to an existing building.
Demolition, reconstruction of structures of 22,000m2 of slabs, approx. 9,000 Tn. Recovery of concrete structures and treatment of pathologies. Steel structure, precast concrete, civil works, for the construction of 2 emergency stair towers of 216m high each. Manufacture and assembly of obelisk and metal structure walkway.
Construction of the bridge over the Guaire River Eastern Section Santa Lucía Kempis Road Integration Axis 160.00 ML.